+27 82 897 0886 info@okusha.com

CAPE GAS TURBINES

2006 – Generator commissioning and HV yard interface at Gourikwa and Ankerlig, and appointed by Eskom PTM to test all generator protection interface 2014 – Simulate both Gourikwa and Ankerlig on DigSILent software in order to calculate Arc Flash Incident levels